Scene 1
· 0:00
Utility feed
94 MW
Data Center
Power
capacity
0 %
The problem
Your data center has a
power ceiling
.
Scene 2
· 0:06
Utility feed
100 MW
Data Center
Power
capacity
100 %
Want more compute?
No more megawatts.
Interconnect queue: 3–7 years.
Scene 3
· 0:13
A hidden truth
Every workload sits on capacity
it doesn't use
.
Each GPU rated at
1000 W
· Average draw
~700 W
·
~300 W of safe headroom per GPU.
Scene 4
· 0:21
PebbleFlex
Measures the
safe-curtailment headroom
on every workload.
SLA-breach-cliff profiling
— the exact watts below which performance breaks.
Scene 5
· 0:31
Aggregated across the fleet —
provable flex power capacity
.
+ 35 MW
flex power unlocked
35 MW
flex / 100 MW DC
1,000
GPU-equiv / MW
<30 s
response time
0
utility upgrade
Scene 6
· 0:41
Utility feed
100 MW
Data Center
Power
capacity
+35 MW
+35,000 GPUs
deployed.
Same utility connection. · No facility expansion.
Scene 7
· 0:50
In production
Grid signal arrives. Pebble curtails
without breaking a single SLA
.
Fleet state · 16 workloads
all healthy
Current draw
After curtail
SLA breach cliff
⚡
Monitoring
Normal operations · 0 signals
Cluster power draw
95.0 MW
-30 s
-15 s
now
Response time
Budget: 30.000 s
00.000
s
+0 MW
Flexed
0
SLA breaches
Every workload drops toward its
red cliff
· none crosses it.
Continuously re-balanced
as conditions shift.
Scene 8
· 1:00
Same utility connection. Same workloads.
+35 MW of new compute capacity.
+ 35 MW
flex power
$ 460 M
/ yr revenue potential
73 ×
ROI on platform fee
< 30 s
curtailment response
Scene 9
· 1:07
pebble
flex
Flex power.
On your existing connection.
Request a Demo →
Watch the Sonar explainer →